Hybrid Power Plants
-
Bağlama Hybrid Power Plant
Van - Gevaş
Capacity: WPP Capacity: 50 MWe - 53.2 MWm SPP Capacity: 50 MWm
- Company:
- Ares Elektrik Üretim A.Ş.
- Start of Operation:
- January 2025 (27 MWm)
- Carbon Credit Certificate:
-
-
Günaydın Hybrid Power Plant
Balıkesir - Manyas
Capacity: WPP Capacity: 20 MWe - 20.8 MWm SPP Capacity: 19 MWm
- Company:
- Kavram Enerji Yatırım Üretim ve Ticaret A.Ş.
- Start of Operation:
- 2012 (10 MWe) - 2014 (17.5MWe) - 2014 (20 MWe)
- Carbon Credit Certificate:
-
-
Uluborlu Hybrid Power Plant
Isparta-Uluborlu
Capacity: WPP Capacity: 60 MWe - 61.2 MWm SPP Capacity: 55 MWm
- Company:
- Kavram Enerji Yatırım Üretim ve Ticaret A.Ş.
- Start of Operation:
- 2016
- Carbon Credit Certificate:
-
-
Pazarköy Hybrid Power Plant
Balıkesir - Çanakkale
Capacity: WPP Capacity: 51.6 MWm - 50.1 MWe SPP Capacity: 31.2 MWm
- Company:
- Tekno Rüzgar Enerji Yatırım Üretim ve Ticaret A.Ş.
- Start of Operation:
- 2020 (3.67 MWe) - 2021 (44 MWe)
- Carbon Credit Certificate:
-